GÖRDES BARAJI RIGHT BANK SOIL IMPROVEMENT 1ST PART SUPPLY

After the water is kept in the Gördes dam, water leakage from the karstic structure of the dam on the right bank of the dam has been prevented. In this context, 48.000 m³ of coating concrete, 107.000 m² of geomembrane and 330.000 m³ of excavation were carried out.

  • YER / LOCATION : Manisa/Gördes
  • TARİHİ / DATE : 2016-2017
  • İŞVEREN / EMPLOYER : DSİ 2. Bölge Müdürlüğü / İZMİR